NASA plans crewed Artemis III low Earth orbit mission for 2027
NASA plans to launch four astronauts on a 14-day Earth orbital test mission in 2027 to prepare for a lunar landing targeted for early 2028.
FTMQ Space, written by our newsroom0 views
NASA is planning to send four astronauts on a 14-day mission in low Earth orbit aboard the Orion spacecraft in 2027, the Huntsville Business Journal reported. The uncrewed and crewed Artemis tests are designed to check systems required to land humans on the surface of the Moon. The Artemis IV mission is targeting a crewed lunar landing in early 2028, which would mark the first human return to the Moon since Apollo 17 in 1972. [1]
As FTMQ Space reported earlier, the Artemis III mission is scheduled to launch in 2027 aboard a Space Launch System rocket from Kennedy Space Center. The 14-day low Earth orbit flight will test human landing system hardware built by SpaceX and Blue Origin. The assigned crew includes astronauts Randy Bresnik, Frank Rubio, Andre Douglas, and Luca Parmitano. [4]
Huntsville, Alabama, is the county seat of Madison County with parts extending into Limestone, Marshall, and Morgan counties. The city's population reached 215,006 at the 2020 census and grew to an estimated 233,627 by July 2025. NASA previously achieved six crewed Moon landings during the Apollo program, beginning with Apollo 11 in 1969. [2][3]
Beyond returning astronauts to the lunar surface, NASA is working on a phased initiative to build a moon base and maintain a long-term human presence, the Huntsville Business Journal reported. The agency also plans to launch Space Reactor-1 before the end of 2028 to demonstrate nuclear electric propulsion technology in deep space. [1]
In short
- NASA plans a 14-day crewed Artemis III low Earth orbit mission for 2027.
- The Artemis IV mission targets a crewed lunar landing in early 2028.
- NASA plans to launch Space Reactor-1 before the end of 2028 to test nuclear electric propulsion in deep space.
Sources
Every paragraph above points to the numbered items it rests on. Read the originals here.
- [1]How Huntsville small businesses can partner with NASA to land humans on the moon in 2028Huntsville Business Journal, 1d ago (the report this story comes from)
Background
- [2]Huntsville, Alabama on Wikipedia
- [3]NASA on Grokipedia
- [4]NASA plans crewed Artemis III orbital lander test for 2027 FTMQ Space, 7d ago
Our newsroom writes these reports with the help of software, from the 4 sources listed and nothing else, and checks them against those sources. Facts can still be wrong or move on; the originals are the record. Spotted a mistake? Write to daniel@monsterkong.com.
More in Moon & Mars
- NASA invites public names for Dragonfly mission to Saturn moon Titan54m ago
- NASA Artemis II Crew Returns to Earth After Lunar Flyby55m ago
- Artemis III Crew Meets President Trump as Hardware Stacking Begins2d ago
- Artemis II commander Reid Wiseman appointed JPL deputy director2d ago
- NASA Perseverance Rover Analyzes Mars Dust Threat to Future Astronauts5d ago
- Artemis II crew completes lunar flyby on historic uncrewed test flight follow up6d ago
Get the day in one email
Reports like this one, the top news of the last 24 hours, every morning. Free, one email a day; readers can comment under every report.
By signing up you agree to our terms and privacy policy. Unsubscribe any time.

Comments
Loading
Join the conversation
Comments are open to readers of our daily email: the top news of the last 24 hours, every morning, free. Sign up and the comment box opens.
Already on the list? Enter the same address and we will send a sign-in link.
By signing up you agree to our terms and privacy policy. Unsubscribe any time.